
Choosing a system
Selection considers deck type, structural loading, insulation, roof traffic, rooftop exhaust and wind exposure. EPDM uses approved rubber seam systems, TPO uses hot-air-welded seams and modified bitumen can use reinforced multi-ply assemblies. Coatings or liquid recover systems are considered only after assessing the existing roof and moisture condition.
Assessment & installation planning
Plan access, weather protection and continuity of operations before opening the roof. Confirm perimeter details, drainage and overflow, penetration heights and any tapered insulation needed to correct low spots. Fire precautions are essential for hot work. Compatible materials and documented installation checks matter more than a generic long-life claim.
Problems, maintenance & next steps
Recurring leakage, saturated insulation, open seams and loose edges can make a surface-only repair unsuitable. A maintenance record should capture inspections, drain clearance, repairs and work by other rooftop trades. Written recommendations should separate urgent defects, routine maintenance and renewal planning. No active maintenance contract, warranty duration or response time is advertised without confirmation.
Draft technical guidance for BC project planning. Service availability and product specifications require confirmation. No Northview qualification, warranty or verified service territory is implied.
